IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,392

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0340 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $393 $0 Implemented
SD0340 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,663 $23,543 Implemented
SD0339 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,112 $320 Implemented
SD0339 # 03 Y:2004 03 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,831 $0 Implemented
SD0335 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $857 $0 Implemented
SD0335 # 05 Y:2004 05 2004 REDESIGN PROCESS $12,125 $8,000 Implemented
SD0336 # 01 Y:2004 01 2004 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $29,002 $0 Implemented
SD0336 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,638 $6,230 Implemented
SD0336 # 04 Y:2004 04 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,095 $0 Implemented
SD0334 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,914 $22,746 Implemented
SD0334 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,538 $31,523 Implemented
SD0334 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,279 $390 Implemented
SD0334 # 07 Y:2004 07 2004 USE EVAPORATION TO CONCENTRATE MATERIAL $641 $380 Implemented
SD0333 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,470 $600 Implemented
SD0333 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,253 $192 Implemented
SD0333 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,128 $0 Implemented
SD0333 # 08 Y:2004 08 2004 INCREASE USE OF AUTOMATION $57,000 $110,000 Implemented
SD0331 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,220 $5,000 Implemented
SD0331 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $108,200 $110,000 Implemented
SD0330 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $887 $80 Implemented
SD0329 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,418 $380 Implemented
SD0328 # 01 Y:2003 01 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $269,910 $1,371,000 Implemented
SD0328 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,323 $0 Implemented
SD0321 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $10,234 $0 Implemented
SD0326 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,397 $4,000 Implemented