Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
707
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0262 # 04 Y:2025 | 04 | 2025 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $13,561 | $178,488 | Implemented |
UU0262 # 06 Y:2025 | 06 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $720 | $1,680 | Implemented |
UU0262 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $24,314 | $29,878 | Implemented |
UU0262 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,129 | $12,300 | Implemented |
UU0262 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,117 | $834 | Implemented |
UU0260 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $489 | $1,818 | Implemented |
UU0260 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $726 | $3,000 | Implemented |
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | Implemented |
UU0261 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,386 | $8,280 | Implemented |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | Implemented |
UU0261 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,063 | $9,140 | Implemented |
UU0261 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,296 | $572,100 | Implemented |
UU0261 # 03 Y:2024 | 03 | 2024 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $12,100 | $21,600 | Implemented |
UU0258 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $120,000 | $198,000 | Implemented |
UU0258 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,800 | $6,200 | Implemented |
UU0259 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $205,038 | $1,865,253 | Implemented |
UU0259 # 05 Y:2024 | 05 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $53,643 | $33,000 | Implemented |
UU0259 # 06 Y:2024 | 06 | 2024 | INSTALL COMMON HEADER ON COMPRESSORS | $3,995 | $9,200 | Implemented |
UU0259 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,165 | $110,030 | Implemented |
UU0257 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $19,121 | Implemented |
UU0257 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,762 | $79,343 | Implemented |
UU0257 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,252 | $5,785 | Implemented |
UU0257 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $2,630 | $12,300 | Implemented |
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | Implemented |
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | Implemented |