IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0219 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $644 $782 Implemented
WI0219 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,622 $0 Implemented
WI0220 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $575 $120 Implemented
WI0220 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,994 $4,917 Implemented
WI0220 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $4,811 $3,581 Implemented
WI0223 # 04 Y:1994 04 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,910 $0 Implemented
WI0223 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $816 $0 Implemented
WI0218 # 01 Y:1994 01 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,760 $8,532 Implemented
WI0218 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,148 $500 Implemented
WI0218 # 02 Y:1994 02 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $7,498 $0 Implemented
WI0217 # 04 Y:1994 04 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $768 $1,400 Implemented
WI0212 # 10 Y:1994 10 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,000 $7,000 Implemented
WI0212 # 06 Y:1994 06 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $585 $370 Implemented
WI0212 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $5,416 $492 Implemented
WI0215 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $848 $1,400 Implemented
WI0215 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $229 $500 Implemented
WI0214 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $2,036 Implemented
WI0214 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,450 $350 Implemented
WI0214 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,682 $500 Implemented
WI0214 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,933 $600 Implemented
WI0214 # 09 Y:1994 09 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,642 $640 Implemented
WI0210 # 07 Y:1994 07 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $551 $500 Implemented
WI0210 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,920 Implemented
WI0210 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,471 $2,200 Implemented
WI0210 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,868 $1,400 Implemented