Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
768
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0040 # 02 Y:2010 | 02 | 2010 | KEEP BOILER TUBES CLEAN | $82,215 | $50,000 | Implemented |
UW0041 # 01 Y:2010 | 01 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,098 | $866 | Implemented |
UW0041 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $653 | $1,306 | Implemented |
UW0041 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $521 | $261 | Implemented |
UW0035 # 02 Y:2010 | 02 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $28,000 | $77,000 | Implemented |
UW0035 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,058 | $1 | Implemented |
UW0035 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $3,700 | $2,000 | Implemented |
UW0034 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,639 | $102,000 | Implemented |
UW0034 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,749 | $115,000 | Implemented |
UW0034 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,077 | $10,000 | Implemented |
UW0033 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $429 | $0 | Implemented |
UW0032 # 02 Y:2009 | 02 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,782 | $31,747 | Implemented |
UW0032 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,643 | $10,000 | Implemented |
UW0032 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,065 | $3,070 | Implemented |
UW0032 # 05 Y:2009 | 05 | 2009 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $297 | $200 | Implemented |
UW0029 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,416 | $120,000 | Implemented |
UW0029 # 02 Y:2009 | 02 | 2009 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,263 | $17,000 | Implemented |
UW0029 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $3,269 | $3,800 | Implemented |
UW0029 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,713 | $9,934 | Implemented |
UW0028 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,942 | $76,700 | Implemented |
UW0028 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $12,524 | $1,960 | Implemented |
UW0028 # 06 Y:2009 | 06 | 2009 | METER WASTE WATER | $1,060 | $12,000 | Implemented |
UW0028 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
UW0027 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,168 | $2,280 | Implemented |
UW0027 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |