IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0767 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,145 $1,383 Implemented
OK0767 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,068 $200 Implemented
OK0767 # 07 Y:2008 07 2008 INSTALL TIMERS AND/OR THERMOSTATS $46,431 $6,300 Implemented
OK0767 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,751 $0 Implemented
OK0759 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,284 $11,736 Implemented
OK0759 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $967 Implemented
OK0753 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $49,649 $0 Implemented
OK0748 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,664 $3,013 Implemented
OK0748 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $559 Implemented
OK0748 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $6,840 Implemented
OK0748 # 04 Y:2007 04 2007 OPERATE BOILERS ON HIGH FIRE SETTING $22,448 $2,495 Implemented
OK0748 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $22,467 $1,029 Implemented
OK0742 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,664 $275 Implemented
OK0742 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $2,516 $3,910 Implemented
OK0734 # 02 Y:2006 02 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $33,532 $47,764 Implemented
OK0734 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,323 $5,175 Implemented
OK0734 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $3,000 $500 Implemented
OK0721 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $415 Implemented
OK0721 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,586 $31,632 Implemented
OK0721 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $13,148 Implemented
OK0703 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,044 $25,020 Implemented
OK0703 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,596 $39,180 Implemented
OK0703 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $1,727 Implemented
OK0703 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,018 $22,540 Implemented
OK0691 # 02 Y:2004 02 2004 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $270,439 $2,825 Implemented