Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,890
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0786 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $854 | $0 | Implemented |
OK0786 # 05 Y:2010 | 05 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $1,491 | $465 | Implemented |
OK0786 # 06 Y:2010 | 06 | 2010 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $903 | $0 | Implemented |
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
OK0767 # 01 Y:2008 | 01 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,145 | $1,383 | Implemented |
OK0767 # 05 Y:2008 | 05 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,068 | $200 | Implemented |
OK0767 # 07 Y:2008 | 07 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $46,431 | $6,300 | Implemented |
OK0767 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,751 | $0 | Implemented |
OK0759 # 01 Y:2008 | 01 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,284 | $11,736 | Implemented |
OK0759 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,620 | $967 | Implemented |
OK0753 # 01 Y:2007 | 01 | 2007 | OPTIMIZE PLANT POWER FACTOR | $49,649 | $0 | Implemented |
OK0748 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,664 | $3,013 | Implemented |
OK0748 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $559 | Implemented |
OK0748 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $6,840 | Implemented |
OK0748 # 04 Y:2007 | 04 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $22,448 | $2,495 | Implemented |
OK0748 # 05 Y:2007 | 05 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $22,467 | $1,029 | Implemented |
OK0742 # 03 Y:2007 | 03 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,664 | $275 | Implemented |
OK0742 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $2,516 | $3,910 | Implemented |
OK0734 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $33,532 | $47,764 | Implemented |
OK0734 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,323 | $5,175 | Implemented |
OK0734 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $3,000 | $500 | Implemented |