Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,600
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0354 # 04 Y:1991 | 04 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $825 | $200 | Implemented |
KU0354 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $570 | $330 | Implemented |
OK0360 # 01 Y:1991 | 01 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,269 | $135 | Implemented |
OK0360 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,965 | $0 | Implemented |
OK0360 # 03 Y:1991 | 03 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,917 | $1,000 | Implemented |
ND0010 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,519 | $6,182 | Implemented |
ND0010 # 02 Y:1991 | 02 | 1991 | OPTIMIZE PLANT POWER FACTOR | $25,245 | $39,150 | Implemented |
ND0010 # 03 Y:1991 | 03 | 1991 | SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL | $573 | $0 | Implemented |
ND0011 # 01 Y:1991 | 01 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $41,503 | $2,000 | Implemented |
ND0011 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,123 | $9,103 | Implemented |
ND0011 # 04 Y:1991 | 04 | 1991 | OPTIMIZE PLANT POWER FACTOR | $11,735 | $35,163 | Implemented |
ND0011 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,996 | $0 | Implemented |
ND0011 # 07 Y:1991 | 07 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,544 | $700 | Implemented |
ND0011 # 08 Y:1991 | 08 | 1991 | REPAIR OR REPLACE STEAM TRAPS | $146 | $250 | Implemented |
AS0040 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,811 | $2,794 | Implemented |
AS0040 # 02 Y:1991 | 02 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,154 | $0 | Implemented |
AS0040 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,134 | $2,543 | Implemented |
AS0040 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,889 | $1,000 | Implemented |
AS0040 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,948 | $0 | Implemented |
AS0040 # 06 Y:1991 | 06 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,041 | $500 | Implemented |
AS0040 # 07 Y:1991 | 07 | 1991 | UPGRADE OBSOLETE EQUIPMENT | $10,456 | $0 | Implemented |
AS0040 # 08 Y:1991 | 08 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,777 | $555 | Implemented |
AS0040 # 09 Y:1991 | 09 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $537 | $776 | Implemented |
AS0040 # 10 Y:1991 | 10 | 1991 | INSTALL SET-BACK TIMERS | $3,044 | $900 | Implemented |
AS0040 # 11 Y:1991 | 11 | 1991 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $190,214 | $0 | Implemented |