IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,271

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0365 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,552 $0 Implemented
WV0365 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,435 $0 Implemented
WV0365 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,863 $2,514 Implemented
WV0363 # 10 Y:2007 10 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,611 $4,505 Implemented
WV0363 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,046 $8,058 Implemented
WV0363 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $12,878 $8,630 Implemented
WV0363 # 03 Y:2007 03 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,259 $122,100 Implemented
WV0363 # 05 Y:2007 05 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,928 $511 Implemented
WV0363 # 06 Y:2007 06 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,228 $9,945 Implemented
WV0363 # 08 Y:2007 08 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,820 $183 Implemented
WV0362 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,397 $0 Implemented
WV0362 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $0 Implemented
WV0362 # 07 Y:2007 07 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,693 $1,500 Implemented
WV0362 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,851 $185 Implemented
WV0362 # 09 Y:2007 09 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,851 $1,000 Implemented
WV0362 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $978 Implemented
WV0362 # 12 Y:2007 12 2007 INSULATE BARE EQUIPMENT $1,295 $740 Implemented
WV0362 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $913 $20 Implemented
WV0362 # 14 Y:2007 14 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $297 $400 Implemented
WV0359 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,126 $26,364 Implemented
WV0359 # 03 Y:2007 03 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,631 $3,500 Implemented
WV0359 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,479 $550 Implemented
WV0359 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,306 $18,395 Implemented
WV0359 # 06 Y:2007 06 2007 DEVELOP A REPAIR/REPLACE POLICY $5,087 $1,973 Implemented
WV0359 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,874 $300 Implemented