Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,681
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0529 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $67,747 | $55,000 | Implemented |
UF0529 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,180 | $25,340 | Implemented |
UF0529 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,645 | $10,000 | Implemented |
UF0529 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $11,158 | $9,464 | Implemented |
UF0529 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,139 | $10,000 | Implemented |
UF0529 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,882 | $2,800 | Implemented |
UF0528 # 02 Y:2019 | 02 | 2019 | INSTALL TURBULATORS | $5,011 | $7,500 | Implemented |
UF0528 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $456 | Implemented |
UF0528 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,284 | $3,000 | Implemented |
UF0528 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $2,054 | $1,025 | Implemented |
UF0527 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,268 | $21,268 | Implemented |
UF0527 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,537 | $24,798 | Implemented |
UF0527 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $456 | Implemented |
UF0527 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $1,039 | $1,393 | Implemented |
UF0527 # 07 Y:2019 | 07 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $24,935 | $1,665 | Implemented |
UF0526 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $727,193 | $3,000,000 | Implemented |
UF0526 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $95,677 | $50,000 | Implemented |
UF0526 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $75,075 | $4,000 | Implemented |
UF0526 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,403 | $0 | Implemented |
UF0526 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,088 | $496 | Implemented |
UF0526 # 06 Y:2019 | 06 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,132 | $9,341 | Implemented |
UF0526 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,738 | $13,541 | Implemented |
MI0350 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $234,952 | $172,151 | Implemented |
MI0350 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $137,608 | $23,779 | Implemented |
MI0350 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,627 | $1,126 | Implemented |