Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
695
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0796 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $634 | $200 | Implemented |
MA0790 # 04 Y:2018 | 04 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $19,380 | $500 | Implemented |
MA0790 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,372 | $5,831 | Implemented |
MA0790 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,658 | $25,350 | Implemented |
MA0790 # 08 Y:2018 | 08 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,934 | $6,774 | Implemented |
MA0790 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,345 | $33,774 | Implemented |
MA0790 # 02 Y:2018 | 02 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $48,698 | $124,000 | Implemented |
MA0781 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $285 | $215 | Implemented |
MA0781 # 04 Y:2017 | 04 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,734 | $2,724 | Implemented |
MA0767 # 05 Y:2016 | 05 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $461 | $157 | Implemented |
MA0767 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $361 | $274 | Implemented |
MA0767 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $911 | $3,330 | Implemented |
MA0767 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $7,620 | $3,955 | Implemented |
MA0765 # 06 Y:2016 | 06 | 2016 | REDUCE VENTILATION AIR | $1,080 | $900 | Implemented |
MA0765 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $1,576 | $1,152 | Implemented |
MA0765 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,000 | $1,000 | Implemented |
MA0765 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $15,004 | $12,000 | Implemented |
MA0763 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,321 | $5,078 | Implemented |
MA0763 # 06 Y:2016 | 06 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,753 | $1,000 | Implemented |
MA0763 # 05 Y:2016 | 05 | 2016 | PAY UTILITY BILLS ON TIME | $2,873 | $500 | Implemented |
MA0763 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,953 | $37,590 | Implemented |
MA0758 # 06 Y:2016 | 06 | 2016 | PAY UTILITY BILLS ON TIME | $672 | $500 | Implemented |
MA0758 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $917 | $960 | Implemented |
MA0758 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $2,272 | $1,450 | Implemented |
MA0758 # 02 Y:2016 | 02 | 2016 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $2,464 | $500 | Implemented |