IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,574

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0312 # 05 Y:2005 05 2005 REDUCE EXCESSIVE BOILER BLOWDOWN $152 $0 Implemented
NC0312 # 06 Y:2005 06 2005 DEVELOP A REPAIR/REPLACE POLICY $125 $273 Implemented
NC0312 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $169 $321 Implemented
NC0312 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100 $100 Implemented
NC0312 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $134 $100 Implemented
NC0310 # 01 Y:2005 01 2005 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $167,500 $150,000 Implemented
NC0310 # 02 Y:2005 02 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $97,500 $61,250 Implemented
NC0310 # 03 Y:2005 03 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $60,000 $20,500 Implemented
NC0310 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,451 $3,000 Implemented
NC0310 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $875 Implemented
NC0310 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $509 $100 Implemented
NC0309 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $89,630 $5,000 Implemented
NC0309 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,148 $21,000 Implemented
NC0309 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,268 $6,500 Implemented
NC0309 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,767 $100 Implemented
NC0308 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,359 $20,313 Implemented
NC0308 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,017 $2,450 Implemented
NC0308 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,767 $6,500 Implemented
NC0308 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,493 $2,000 Implemented
NC0308 # 07 Y:2005 07 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $867 $750 Implemented
NC0308 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $338 $160 Implemented
NC0307 # 02 Y:2004 02 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $72,400 $49,500 Implemented
NC0307 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,171 $100 Implemented
NC0305 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $349 $100 Implemented
NC0305 # 07 Y:2004 07 2004 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $320 $58 Implemented