IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,191

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0105 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,211 $2,000 Implemented
IC0105 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $17,271 $3,900 Implemented
BD0290 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,277 $15,080 Implemented
BD0290 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,841 $9,598 Implemented
BD0290 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,855 $825 Implemented
BD0290 # 06 Y:2005 06 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,597 $100 Implemented
BD0290 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $810 $1,000 Implemented
BD0290 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $530 $1,000 Implemented
BD0290 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $429 $0 Implemented
BD0290 # 10 Y:2005 10 2005 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $396 $750 Implemented
BD0290 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $265 Implemented
BD0290 # 13 Y:2005 13 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,381 $700 Implemented
BD0290 # 14 Y:2005 14 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $406 $450 Implemented
BD0290 # 15 Y:2005 15 2005 METER WASTE WATER $728 $250 Implemented
BD0286 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140,820 $28,500 Implemented
BD0286 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94,025 $122,830 Implemented
BD0286 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,974 $14,000 Implemented
BD0286 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $9,987 $2,625 Implemented
BD0286 # 06 Y:2005 06 2005 INSTALL TURBULATORS $8,810 $12,000 Implemented
BD0286 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,152 $1,200 Implemented
BD0286 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,506 $0 Implemented
BD0286 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $350 Implemented
BD0286 # 13 Y:2005 13 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,243,590 $504,283 Implemented
BD0287 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $13,639 $248 Implemented
BD0287 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $9,255 $19,600 Implemented