IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,574

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0288 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,570 $1,725 Implemented
NC0288 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $100 Implemented
NC0288 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,216 $3,800 Implemented
NC0295 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $100 Implemented
NC0295 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,285 $3,200 Implemented
NC0286 # 02 Y:2004 02 2004 REDUCE VENTILATION AIR $12,177 $35,730 Implemented
NC0286 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,904 $100 Implemented
NC0286 # 04 Y:2004 04 2004 UPGRADE CONTROLS ON COMPRESSORS $1,892 $2,000 Implemented
NC0286 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $175 $169 Implemented
NC0286 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $247 $191 Implemented
NC0284 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,310 $26,200 Implemented
NC0284 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,667 $10,600 Implemented
NC0284 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $1,002 Implemented
NC0284 # 07 Y:2004 07 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $469 $1,000 Implemented
NC0283 # 02 Y:2004 02 2004 RECOVER AND REUSE COOLING WATER $7,112 $6,000 Implemented
NC0283 # 03 Y:2004 03 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,469 $1,200 Implemented
NC0283 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,077 $356 Implemented
NC0280 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,201 $700 Implemented
NC0276 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $18,000 $8,050 Implemented
NC0276 # 05 Y:2004 05 2004 DEVELOP A REPAIR/REPLACE POLICY $1,432 $1,085 Implemented
NC0276 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,023 $1,170 Implemented
NC0275 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,207 $4,563 Implemented
NC0275 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $683 Implemented
NC0272 # 03 Y:2003 03 2003 RECOVER AND REUSE WASTE MATERIAL $990 $400 Implemented
NC0272 # 04 Y:2003 04 2003 USE PHOTOCELL CONTROLS $167 $235 Implemented