IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,574

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0257 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $1,346 $1,540 Implemented
NC0259 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $7,357 $1,650 Implemented
NC0259 # 02 Y:2003 02 2003 DEVELOP A REPAIR/REPLACE POLICY $3,711 $5,940 Implemented
NC0259 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,905 $50 Implemented
NC0259 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $862 Implemented
NC0259 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,879 $1,740 Implemented
NC0259 # 10 Y:2003 10 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,785 $12,240 Implemented
NC0252 # 02 Y:2003 02 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,800 $6,000 Implemented
NC0252 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,917 $400 Implemented
NC0252 # 05 Y:2003 05 2003 REDESIGN PROCESS $4,814 $780 Implemented
NC0252 # 06 Y:2003 06 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $780 $1,000 Implemented
NC0247 # 01 Y:2002 01 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $44,473 $120,000 Implemented
NC0247 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $1,646 $540 Implemented
NC0247 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,600 $2,665 Implemented
NC0247 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $100 Implemented
NC0247 # 07 Y:2002 07 2002 DEVELOP A REPAIR/REPLACE POLICY $774 $863 Implemented
NC0247 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,850 $1,004 Implemented
NC0247 # 09 Y:2002 09 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $860 $500 Implemented
NC0251 # 04 Y:2002 04 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $6,367 $10,000 Implemented
NC0251 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $4,768 $10,000 Implemented
NC0251 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $137 $574 Implemented
NC0246 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,196 $11,000 Implemented
NC0246 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,851 $100 Implemented
NC0246 # 07 Y:2002 07 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $323 $760 Implemented
NC0248 # 03 Y:2002 03 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,379 $7,882 Implemented