IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,532

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0369 # 14 Y:2008 14 2008 INSULATE BARE EQUIPMENT $2,008 $1,241 Implemented
WV0369 # 16 Y:2008 16 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,266 $114 Implemented
WV0369 # 17 Y:2008 17 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $835 $0 Implemented
WV0369 # 19 Y:2008 19 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $563 $585 Implemented
WV0369 # 20 Y:2008 20 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $389 $470 Implemented
LE0267 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,140 $6,000 Implemented
LE0267 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,169 $30,000 Implemented
LE0267 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $31,944 $2,000 Implemented
LE0267 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,200 $3,000 Implemented
LE0267 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,723 $1,000 Implemented
LE0267 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,129 $300,000 Implemented
LE0266 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $42,137 $2,614 Implemented
LE0265 # 01 Y:2007 01 2007 UTILIZE OUTSIDE CONTRACTING $45,000 $7,800 Implemented
LE0265 # 02 Y:2007 02 2007 INSTALL TIMERS AND/OR THERMOSTATS $10,266 $2,250 Implemented
LE0265 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,608 $860 Implemented
LE0265 # 05 Y:2007 05 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,558 $0 Implemented
LE0265 # 06 Y:2007 06 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $594 $0 Implemented
LE0264 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,680 $50,000 Implemented
LE0264 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,103 $2,500 Implemented
LE0264 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,204 $2,000 Implemented
LE0264 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $500 Implemented
LE0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
WV0364 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $29,507 $12,903 Implemented
WV0364 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,283 $0 Implemented