IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,322

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0589 # 11 Y:2023 11 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,770 $2,800 Implemented
UF0589 # 12 Y:2023 12 2023 INSTALL TURBULATORS $4,595 $7,500 Implemented
UF0589 # 13 Y:2023 13 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $4,532 $754 Implemented
UF0589 # 14 Y:2023 14 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,316 $3,069 Implemented
UF0589 # 15 Y:2023 15 2023 INSTALL OCCUPANCY SENSORS $2,868 $9,968 Implemented
UF0589 # 16 Y:2023 16 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,322 $0 Implemented
UF0589 # 17 Y:2023 17 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $88,974 $10,000 Implemented
LE0541 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,461 $100 Implemented
LE0541 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $4,210 Implemented
LE0541 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $2,400 Implemented
MA0853 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,202 $18,988 Implemented
MA0853 # 03 Y:2023 03 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,672 $30,500 Implemented
MA0853 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,613 $59,377 Implemented
MA0853 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,336 $24,300 Implemented
NL0077 # 02 Y:2023 02 2023 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $121,895 $4,200 Implemented
NL0077 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,279 $4,500 Implemented
NL0077 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $527 $200 Implemented
NT0001 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,144 $5,801 Implemented
NT0001 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,452 $9,984 Implemented
NT0001 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,130 $1,258 Implemented
NT0001 # 05 Y:2023 05 2023 INSTALL SET-BACK TIMERS $883 $0 Implemented
NT0001 # 06 Y:2023 06 2023 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,710 $0 Implemented
NT0001 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,707 $6,472 Implemented
MA0851 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $135,448 $385,041 Implemented
MA0851 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $28,576 $1,000 Implemented