IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

418

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0143 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,112 $7,124 Implemented
NV0141 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,845 $2,532 Implemented
NV0141 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,401 $0 Implemented
NV0138 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $450 Implemented
NV0138 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,007 $400 Implemented
NV0138 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $708 $1,391 Implemented
NV0137 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $300 Implemented
NV0137 # 03 Y:1999 03 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $198 $25 Implemented
NV0137 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,390 $7,970 Implemented
NV0134 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $150 Implemented
NV0133 # 01 Y:1999 01 1999 REPLACE BOILER $20,745 $14,694 Implemented
NV0133 # 06 Y:1999 06 1999 PAY UTILITY BILLS ON TIME $1,013 $0 Implemented
NV0131 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,277 $638 Implemented
NV0131 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $111 $80 Implemented
NV0131 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $327 $0 Implemented
NV0131 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $50 Implemented
NV0127 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $704 $1,500 Implemented
NV0127 # 04 Y:1999 04 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,768 $588 Implemented
NV0127 # 08 Y:1999 08 1999 USE RADIANT HEATER FOR SPOT HEATING $3,636 $4,525 Implemented
NV0127 # 10 Y:1999 10 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,343 $325 Implemented
NV0124 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,858 $7,243 Implemented
NV0124 # 06 Y:1999 06 1999 UTILIZE OUTSIDE CONTRACTING $93,148 $0 Implemented
NV0121 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,107 $12,275 Implemented
NV0121 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,198 $0 Implemented
NV0119 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,884 $48,211 Implemented