Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
418
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0143 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,112 | $7,124 | Implemented |
NV0141 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,845 | $2,532 | Implemented |
NV0141 # 03 Y:1999 | 03 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,401 | $0 | Implemented |
NV0138 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $255 | $450 | Implemented |
NV0138 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,007 | $400 | Implemented |
NV0138 # 05 Y:1999 | 05 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $708 | $1,391 | Implemented |
NV0137 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $372 | $300 | Implemented |
NV0137 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $198 | $25 | Implemented |
NV0137 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,390 | $7,970 | Implemented |
NV0134 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $855 | $150 | Implemented |
NV0133 # 01 Y:1999 | 01 | 1999 | REPLACE BOILER | $20,745 | $14,694 | Implemented |
NV0133 # 06 Y:1999 | 06 | 1999 | PAY UTILITY BILLS ON TIME | $1,013 | $0 | Implemented |
NV0131 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,277 | $638 | Implemented |
NV0131 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $111 | $80 | Implemented |
NV0131 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $327 | $0 | Implemented |
NV0131 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $444 | $50 | Implemented |
NV0127 # 01 Y:1999 | 01 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $704 | $1,500 | Implemented |
NV0127 # 04 Y:1999 | 04 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,768 | $588 | Implemented |
NV0127 # 08 Y:1999 | 08 | 1999 | USE RADIANT HEATER FOR SPOT HEATING | $3,636 | $4,525 | Implemented |
NV0127 # 10 Y:1999 | 10 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,343 | $325 | Implemented |
NV0124 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,858 | $7,243 | Implemented |
NV0124 # 06 Y:1999 | 06 | 1999 | UTILIZE OUTSIDE CONTRACTING | $93,148 | $0 | Implemented |
NV0121 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,107 | $12,275 | Implemented |
NV0121 # 04 Y:1999 | 04 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,198 | $0 | Implemented |
NV0119 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $60,884 | $48,211 | Implemented |