IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,191

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0216 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $5,756 $1,500 Implemented
BD0216 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,518 $1,800 Implemented
BD0216 # 07 Y:2002 07 2002 INSTALL TURBULATORS $813 $1,700 Implemented
BD0216 # 11 Y:2002 11 2002 REPAIR AND ELIMINATE STEAM LEAKS $208 $300 Implemented
IC0041 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,772 $18,245 Implemented
IC0041 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $5,000 Implemented
IC0041 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $9,358 $8,500 Implemented
IC0041 # 07 Y:2002 07 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $16,000 $8,000 Implemented
BD0215 # 01 Y:2002 01 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,511 $4,000 Implemented
BD0215 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $562 $400 Implemented
BD0214 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,378 $700 Implemented
BD0214 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $222 $215 Implemented
BD0213 # 02 Y:2002 02 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $29,490 $10,000 Implemented
BD0213 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,926 $0 Implemented
BD0213 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $2,793 $11,150 Implemented
BD0213 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $1,056 $600 Implemented
BD0213 # 09 Y:2002 09 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $400 Implemented
BD0212 # 01 Y:2002 01 2002 REPLACE BOILER $17,844 $70,000 Implemented
BD0212 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $3,764 $3,075 Implemented
BD0212 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,605 $1,100 Implemented
BD0212 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,219 $600 Implemented
BD0212 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $931 $1,000 Implemented
BD0212 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $333 Implemented
BD0211 # 01 Y:2002 01 2002 USE RADIANT HEATER FOR SPOT HEATING $20,195 $31,000 Implemented
BD0211 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,837 $900 Implemented