Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,719
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0670 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $14,066 | $10,367 | Implemented |
OR0670 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,978 | $1,314 | Implemented |
OR0668 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,966 | $1,900 | Implemented |
OR0668 # 03 Y:2016 | 03 | 2016 | REDUCE FLUID FLOW RATES | $9,090 | $13,345 | Implemented |
OR0667 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,538 | $0 | Implemented |
OR0667 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,475 | $35,460 | Implemented |
OR0665 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,044 | $11,800 | Implemented |
OR0665 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,434 | $0 | Implemented |
OR0664 # 03 Y:2016 | 03 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $12,507 | $32,393 | Implemented |
OR0662 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,683 | $6,683 | Implemented |
OR0658 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $680,062 | $427,000 | Implemented |
OR0658 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $54,203 | $59,203 | Implemented |
OR0657 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,205 | $50,205 | Implemented |
OR0656 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,308,919 | $1,300,000 | Implemented |
OR0656 # 02 Y:2015 | 02 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $188,688 | $247,000 | Implemented |
OR0656 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,591 | $27,789 | Implemented |
OR0656 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,282 | $22,500 | Implemented |
OR0651 # 01 Y:2015 | 01 | 2015 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $58,422 | $9,638 | Implemented |
OR0651 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $270,822 | $210,050 | Implemented |
OR0650 # 03 Y:2015 | 03 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $719 | $1,200 | Implemented |
OR0650 # 05 Y:2015 | 05 | 2015 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $1,291 | $4,404 | Implemented |
OR0649 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,484 | $2,065 | Implemented |
OR0649 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $2,139 | Implemented |
OR0649 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,638 | $1,819 | Implemented |
OR0649 # 11 Y:2015 | 11 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,941 | $19,500 | Implemented |