Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
627
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0177 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $36,240 | $6,760 | Implemented |
UU0177 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,515 | $5,046 | Implemented |
UU0177 # 05 Y:2021 | 05 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,455 | $14,250 | Implemented |
UU0177 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,105 | $11,650 | Implemented |
UU0177 # 08 Y:2021 | 08 | 2021 | REDUCE VENTILATION AIR | $4,129 | $4,000 | Implemented |
UU0177 # 09 Y:2021 | 09 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,497 | $100 | Implemented |
UU0176 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $94,747 | $42,608 | Implemented |
UU0176 # 03 Y:2021 | 03 | 2021 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $29,753 | $10,400 | Implemented |
UU0176 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,766 | $7,600 | Implemented |
UU0176 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,411 | $5,700 | Implemented |
UU0173 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,743 | $3,188 | Implemented |
UU0173 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,755 | $8,095 | Implemented |
UU0173 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,018 | $474 | Implemented |
UU0175 # 01 Y:2021 | 01 | 2021 | ELIMINATE/REDUCE AN OPERATION | $154,852 | $42,000 | Implemented |
UU0175 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $31,653 | $35,841 | Implemented |
UU0175 # 03 Y:2021 | 03 | 2021 | REPLACE BOILER | $8,979 | $46,872 | Implemented |
UU0175 # 05 Y:2021 | 05 | 2021 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,532 | $6,178 | Implemented |
UU0174 # 01 Y:2021 | 01 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $24,060 | $178,852 | Implemented |
UU0174 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,383 | $85,347 | Implemented |
UU0174 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $744 | $200 | Implemented |
UU0172 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,439 | $15,243 | Implemented |
UU0172 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,814 | $7,952 | Implemented |
UU0172 # 06 Y:2021 | 06 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,039 | $17,334 | Implemented |
UU0172 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,543 | $100 | Implemented |
UU0172 # 08 Y:2021 | 08 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,268 | $212 | Implemented |