IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0291 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,113 $720 Implemented
SF0291 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $9,569 $1,464 Implemented
SF0291 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,810 $5,675 Implemented
SF0291 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,732 $78,810 Implemented
SF0291 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $914 $3,294 Implemented
SD0349 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,934 $4,300 Implemented
SD0349 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,757 $920 Implemented
SD0349 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $3,423 Implemented
SD0349 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,780 $18,500 Implemented
LM0083 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $836 $0 Implemented
LM0083 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $110 $150 Implemented
SD0347 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $450 Implemented
SD0347 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,552 $0 Implemented
SD0346 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,785 $320 Implemented
SD0346 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,306 $9,465 Implemented
SF0289 # 01 Y:2004 01 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,527 $2,527 Implemented
SF0289 # 02 Y:2004 02 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $956 $180 Implemented
SF0289 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $270 $885 Implemented
SF0289 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,750 $6,748 Implemented
LM0081 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,857 $300 Implemented
LM0080 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $475 Implemented
LM0080 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $537 $0 Implemented
LM0080 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,164 $300 Implemented
SF0288 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $334 $1,065 Implemented
SD0345 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,904 $560 Implemented