IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0291 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,186 $0 Implemented
WV0291 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $100 Implemented
WV0288 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,141 $360 Implemented
WV0288 # 05 Y:2004 05 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,212 $1,200 Implemented
WV0288 # 06 Y:2004 06 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,772 $27,600 Implemented
WV0288 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $4,573 $1,000 Implemented
WV0288 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,932 $50 Implemented
WV0288 # 10 Y:2004 10 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,739 $575 Implemented
WV0288 # 13 Y:2004 13 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $203 $25 Implemented
WV0288 # 14 Y:2004 14 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $200 Implemented
WV0287 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $9,905 $479 Implemented
WV0287 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,944 $0 Implemented
WV0287 # 04 Y:2004 04 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,353 $700 Implemented
WV0287 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $2,932 $97 Implemented
WV0287 # 07 Y:2004 07 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $2,860 $250 Implemented
WV0287 # 09 Y:2004 09 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,482 $1,000 Implemented
WV0287 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $906 $0 Implemented
WV0287 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $754 $50 Implemented
UD0692 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,575 $325 Implemented
UD0692 # 05 Y:2004 05 2004 COVER OPEN TANKS $888 $3,450 Implemented
UD0692 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $400 Implemented
WV0286 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $4,469 $3,580 Implemented
WV0286 # 03 Y:2004 03 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,072 $360 Implemented
WV0286 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,971 $250 Implemented
WV0286 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,455 $1,770 Implemented