IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0369 # 04 Y:2025 04 2025 INSTALL OCCUPANCY SENSORS $23,108 $9,760 Implemented
MZ0369 # 02 Y:2025 02 2025 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,668 $35,570 Implemented
MZ0369 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,599 $7,900 Implemented
MZ0366 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,674 $14,000 Implemented
MZ0366 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,395 $800 Implemented
MZ0366 # 04 Y:2024 04 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,668 $59,968 Implemented
MZ0367 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,987 $1,000 Implemented
MZ0367 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,969 $3,120 Implemented
MZ0367 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $852 $400 Implemented
MZ0365 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,949 $1,000 Implemented
MZ0365 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,036 $6,500 Implemented
MZ0365 # 04 Y:2024 04 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $96 $520 Implemented
MZ0365 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,741 $805 Implemented
IC0299 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,981 $847 Implemented
IC0299 # 06 Y:2024 06 2024 BURN A LESS EXPENSIVE GRADE OF FUEL $447,899 $23,503 Implemented
IC0299 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $23,893 $3,458 Implemented
IC0299 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $642 Implemented
IC0292 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $434 $0 Implemented
IC0292 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $19,216 $10,388 Implemented
IC0292 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,518 $9,738 Implemented
IC0292 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,786 $0 Implemented
NL0076 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,194 $140 Implemented
NL0076 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,256 $4,500 Implemented
NL0076 # 06 Y:2022 06 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,338 $7,210 Implemented
NL0070 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $675 $3,315 Implemented