Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0600 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $940 | $392 | Implemented |
OR0600 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,704 | $500 | Implemented |
OR0600 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $334 | $0 | Implemented |
OR0600 # 06 Y:2012 | 06 | 2012 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,653 | $385 | Implemented |
OR0600 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,399 | $560 | Implemented |
OR0600 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,835 | $2,724 | Implemented |
OR0599 # 02 Y:2012 | 02 | 2012 | INSTALL AUTOMATIC PACKING EQUIPMENT | $35,308 | $0 | Implemented |
OR0599 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,611 | $12,467 | Implemented |
OR0599 # 04 Y:2012 | 04 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,409 | $0 | Implemented |
OR0594 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,684 | $7,360 | Implemented |
OR0594 # 03 Y:2012 | 03 | 2012 | Install Anaerobic Digester | $1,369,423 | $3,468,069 | Implemented |
OR0591 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $6,968 | Implemented |
OR0591 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $920,649 | $25,909 | Implemented |
OR0590 # 02 Y:2012 | 02 | 2012 | USE OPTIMUM TEMPERATURE | $3,137 | $0 | Implemented |
OR0589 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,711 | $6,200 | Implemented |
OR0589 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $53,151 | Implemented |
OR0585 # 11 Y:2012 | 11 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $12,086 | $16,390 | Implemented |
OR0585 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,028 | $2,305 | Implemented |
OR0583 # 06 Y:2012 | 06 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,779 | $6,600 | Implemented |
OR0583 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,391 | $3,854 | Implemented |
OR0583 # 04 Y:2012 | 04 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $6,078 | $500 | Implemented |
OR0583 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,663 | $19,592 | Implemented |
OR0583 # 01 Y:2012 | 01 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $3,140 | $2,412 | Implemented |
OR0580 # 02 Y:2012 | 02 | 2012 | ELIMINATE/REDUCE AN OPERATION | $3,906 | $14,500 | Implemented |
OR0580 # 01 Y:2012 | 01 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $12,485 | $850 | Implemented |