IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,687

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0459 # 11 Y:2012 11 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,330 $90 Implemented
UA3023 # 04 Y:2012 04 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,914 $180 Implemented
UA3023 # 07 Y:2012 07 2012 DISCONNECT BALLASTS $6,783 $1,013 Implemented
UA3023 # 08 Y:2012 08 2012 DISCONNECT BALLASTS $4,820 $810 Implemented
UA3023 # 09 Y:2012 09 2012 DISCONNECT BALLASTS $3,927 $810 Implemented
OK0835 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,445 $1,500 Implemented
OK0835 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $538 $3,183 Implemented
OK0835 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,937 $1,000 Implemented
OK0835 # 11 Y:2012 11 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $621 $120 Implemented
OK0835 # 12 Y:2012 12 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $31,425 $0 Implemented
OR0596 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,779 $2,217 Implemented
OR0596 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $48,291 $10,000 Implemented
NC0468 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,060 $800 Implemented
NC0468 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,026 $18,000 Implemented
NC0468 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $2,082 $2,100 Implemented
NC0468 # 12 Y:2012 12 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $34,749 $7,000 Implemented
OR0595 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,800 $8,370 Implemented
OR0595 # 03 Y:2012 03 2012 RECOVER MECHANICAL ENERGY $1,034 $780 Implemented
OR0595 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,312 $4,888 Implemented
MAS031 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,552 $150 Implemented
MAS031 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $593 $425 Implemented
SD0458 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,667 $34,450 Implemented
TT0099 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,046 $1,000 Implemented
TT0099 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,777 $980 Implemented
TT0099 # 03 Y:2012 03 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,303 $10,800 Implemented