IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2209 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,845 $6,616 Implemented
UW2209 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,276 $0 Implemented
IP0163 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $241 $0 Implemented
IP0163 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,306 $3 Implemented
IP0163 # 04 Y:2022 04 2022 USE PHOTOCELL CONTROLS $2,682 $248 Implemented
IP0163 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $712 $72 Implemented
IP0163 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,466 $3,681 Implemented
IP0163 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,570 $851 Implemented
IP0163 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,345 $2,259 Implemented
IP0163 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $640 $674 Implemented
TR0028 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $3,155 Implemented
TR0028 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,584 $602 Implemented
TR0028 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $787 $1,511 Implemented
UA0262 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,023 $44,464 Implemented
UA0262 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,699 $2,060 Implemented
UA0262 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,104 $4,929 Implemented
MA0845 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,668 $60,000 Implemented
MA0845 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,754 $14,292 Implemented
CM1006 # 04 Y:2022 04 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $118 $0 Implemented
CM1006 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $156 $500 Implemented
CM1006 # 07 Y:2022 07 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $29,546 $160,998 Implemented
UD1048 # 03 Y:2022 03 2022 DISCONNECT BALLASTS $1,787 $0 Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented