IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0350 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $60,709 $140,732 n/a
NL0083 # 01 Y:2023 01 2023 METER WASTE WATER $31,255 $85,280 n/a
NL0083 # 02 Y:2023 02 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,134 $16,860 n/a
NL0083 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,038 $4,600 n/a
NL0083 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,182 $4,945 n/a
NL0083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $470 n/a
NL0083 # 06 Y:2023 06 2023 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $800 $1,548 n/a
NL0083 # 07 Y:2023 07 2023 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $200 $40 n/a
UU0228 # 01 Y:2023 01 2023 OPERATE BOILERS ON HIGH FIRE SETTING $5,182 $15,000 n/a
UU0228 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,009 $850 n/a
UU0228 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,221 $85 n/a
UU0228 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,330 $2,040 n/a
UU0228 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $389 $170 n/a
UU0228 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $248 $255 n/a
SD0642 # 01 Y:2023 01 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,793 $2,300 n/a
SD0642 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,958 $14,573 n/a
SD0642 # 03 Y:2023 03 2023 USE MORE EFFICIENT ADHESIVE APPLICATORS $14,334 $2,200 n/a
SD0642 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,070 $500 n/a
SD0642 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $44,733 $141,268 n/a
SD0642 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $4,384 $0 n/a
SD0642 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $847 n/a
SD0642 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,872 $2,290 n/a
SD0642 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,066 $5,607 n/a
AS0557 # 01 Y:2023 01 2023 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,610 $960 Not Implemented
AS0557 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,169 $2,419 Implemented