IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

165,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0620 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,958 $2,120 Implemented
UF0620 # 09 Y:2024 09 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,209 $0 Implemented
UF0620 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,038 $0 Implemented
UF0620 # 11 Y:2024 11 2024 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $40,000 $100,000 Implemented
MS0431 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $60,065 $1,274,840 n/a
MS0431 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $57,233 $175,000 n/a
MS0431 # 03 Y:2024 03 2024 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $2,111 $124,000 n/a
NL0097 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,785 $3,750 Implemented
NL0097 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,684 $3,900 Implemented
NL0097 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $10,810 Implemented
NL0097 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,054 $2,080 Implemented
NL0097 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,556 $1,315 Implemented
NL0097 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,203 $120 Implemented
NL0097 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $1,210 $1,348 Not Implemented
NL0097 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $422 Implemented
SF0623 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,288 $0 Implemented
SF0623 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $4,851 $0 Implemented
SF0623 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $1,146 Implemented
SF0623 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,599 $3,962 Implemented
SF0623 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,720 $4,257 Implemented
SU0557 # 01 Y:2024 01 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $616 $0 n/a
SU0557 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,970 $0 n/a
SU0557 # 03 Y:2024 03 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,702 $0 n/a
SU0557 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,953 $0 n/a
SU0557 # 05 Y:2024 05 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $813 $105 n/a