IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0672 # 02 Y:2013 02 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $16,940 $58,410 Not Implemented
CO0672 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $5,660 Not Implemented
CO0672 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,600 $500 Not Implemented
CO0672 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $2,400 $32,500 Not Implemented
CO0671 # 01 Y:2013 01 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $62,960 $65,530 Implemented
CO0671 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $850 $2,190 Not Implemented
CO0670 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,960 $670 Implemented
CO0670 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,830 $25,400 Not Implemented
CO0670 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,800 $620 Implemented
CO0670 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,160 $330 Implemented
CO0670 # 05 Y:2013 05 2013 USE EVAPORATION TO CONCENTRATE MATERIAL $660 $0 Implemented
CO0670 # 06 Y:2013 06 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $500 Implemented
CO0669 # 01 Y:2013 01 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,590 $15,280 Implemented
CO0669 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $4,190 $4,840 Not Implemented
CO0669 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $390 Implemented
CO0668 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,280 $45,000 Implemented
CO0668 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,280 $2,040 Implemented
CO0668 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,450 $48,290 Implemented
CO0668 # 04 Y:2013 04 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,280 $500 Implemented
CO0668 # 05 Y:2013 05 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,950 $500 Implemented
CO0667 # 01 Y:2013 01 2013 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,220 $50,000 Implemented
CO0667 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,950 $17,590 Implemented
CO0667 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,460 $11,450 Implemented
CO0667 # 04 Y:2013 04 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $13,790 $35,250 Implemented
CO0667 # 05 Y:2013 05 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,370 $4,500 Implemented