Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0560 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,025 | $75,360 | Implemented |
AS0560 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $21,635 | $819,000 | Implemented |
AS0560 # 01 Y:2023 | 01 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $701,165 | $7,692,249 | Not Implemented |
AS0544 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $874 | $1,115 | Not Implemented |
AS0544 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,591 | $2,841 | Not Implemented |
AS0544 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $8,391 | $6,033 | Not Implemented |
AS0544 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,200 | $21,887 | Not Implemented |
AS0544 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,226 | $18,665 | Not Implemented |
AS0543 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,306 | $2,116 | Implemented |
AS0542 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,466 | $22,203 | Implemented |
AS0542 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $9,017 | $19,689 | Not Implemented |
AS0542 # 03 Y:2023 | 03 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $5,088 | $71 | Implemented |
AS0542 # 04 Y:2023 | 04 | 2023 | ELIMINATE/REDUCE AN OPERATION | $331 | $50 | Not Implemented |
AS0543 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,420 | $76,246 | Not Implemented |
AS0543 # 02 Y:2023 | 02 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,804 | $8,019 | Implemented |
AS0543 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $493 | $25 | Implemented |
AS0543 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $150 | $92 | Implemented |
AS0543 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $81 | $222 | Not Implemented |
AS0540 # 05 Y:2022 | 05 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $237 | $398 | Not Implemented |
AS0540 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $395 | $1,341 | Implemented |
AS0540 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,767 | $4,200 | Implemented |
AS0540 # 02 Y:2022 | 02 | 2022 | PAY BILLS ON TIME TO AVOID LATE FEES | $9,085 | $21 | Implemented |
AS0540 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $9,774 | $97,049 | Not Implemented |
AS0476 # 02 Y:2019 | 02 | 2019 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $379,615 | $78,024 | Not Implemented |
AS0476 # 01 Y:2019 | 01 | 2019 | INSTALL WIND POWERED ELECTRIC GENERATOR | $924,031 | $7,925,140 | Not Implemented |