Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,760
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0621 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $423 | $13,505 | Not Implemented |
OR0620 # 01 Y:2013 | 01 | 2013 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $50,574 | $68,750 | Not Implemented |
OR0620 # 02 Y:2013 | 02 | 2013 | REDUCE VENTILATION AIR | $28,525 | $3,200 | Not Implemented |
OR0620 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $456 | $163 | Not Implemented |
OR0620 # 04 Y:2013 | 04 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $442 | $481 | Not Implemented |
OR0620 # 05 Y:2013 | 05 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $584 | $2,554 | Not Implemented |
OR0619 # 01 Y:2013 | 01 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,073 | $2,342 | Not Implemented |
OR0619 # 02 Y:2013 | 02 | 2013 | REDUCE FLUID FLOW RATES | $2,879 | $6,200 | Not Implemented |
OR0619 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,300 | $50,000 | Not Implemented |
OR0619 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $679 | $1,677 | Not Implemented |
OR0619 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,667 | $2,342 | Not Implemented |
OR0619 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,550 | $13,225 | Not Implemented |
OR0615 # 01 Y:2013 | 01 | 2013 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $24,283 | $1,000 | Implemented |
OR0615 # 02 Y:2013 | 02 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $48,896 | $68,866 | Implemented |
OR0615 # 03 Y:2013 | 03 | 2013 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $791,616 | $300,000 | Not Implemented |
OR0615 # 04 Y:2013 | 04 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,731 | $17,127 | Implemented |
OR0615 # 05 Y:2013 | 05 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,352 | $36,600 | Not Implemented |
OR0615 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,601 | $4,986 | Implemented |
OR0614 # 01 Y:2013 | 01 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $31,637 | $42,000 | Not Implemented |
OR0614 # 02 Y:2013 | 02 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,101 | $10,000 | Implemented |
OR0614 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,327 | $0 | Implemented |
OR0614 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,554 | $1,828 | Not Implemented |
OR0614 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $667 | $446 | Not Implemented |
OR0612 # 01 Y:2013 | 01 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $30,841 | $79,939 | Not Implemented |
OR0612 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,184 | $10,125 | Implemented |