IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0307 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $4,579 $6,640 n/a
SD0210 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $901 $0 Not Implemented
SD0210 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,500 $36,250 Not Implemented
SD0210 # 03 Y:1998 03 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,860 $3,100 Not Implemented
BD0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,459 $600 Implemented
BD0120 # 02 Y:1998 02 1998 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,250 $4,000 Not Implemented
BD0120 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,816 $11,230 Implemented
BD0120 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,527 $400 Not Implemented
BD0120 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,992 $500 Not Implemented
BD0120 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $985 $750 Not Implemented
BD0120 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $1,780 $750 Not Implemented
BD0120 # 08 Y:1998 08 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $2,430 $1,000 Not Implemented
BD0120 # 09 Y:1998 09 1998 PAY BILLS ON TIME TO AVOID LATE FEES $332 $0 Not Implemented
AS0238 # 01 Y:1998 01 1998 INSTALL TIMERS AND/OR THERMOSTATS $901 $1,875 Not Implemented
AS0238 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,256 $16,930 Not Implemented
AS0238 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,014 $60 Not Implemented
AS0238 # 04 Y:1998 04 1998 APPLY FOR INVESTMENT INCENTIVES $1,436 $60 Not Implemented
CO0427 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $2,082 Implemented
CO0427 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $1,000 Implemented
CO0427 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $40 Implemented
CO0427 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $210 $0 Not Implemented
CO0427 # 05 Y:1998 05 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $34,700 $300,000 Not Implemented
CO0427 # 06 Y:1998 06 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,080 $30,000 Not Implemented
CO0427 # 07 Y:1998 07 1998 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $18,250 $27,000 Implemented
KU0509 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,070 $0 Implemented