Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,061
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0020 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,898 | $9,577 | n/a |
SJ0020 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $156 | $358 | n/a |
SJ0020 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $178 | $770 | n/a |
SJ0020 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,344 | $0 | n/a |
SJ0020 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,851 | $0 | n/a |
SJ0020 # 07 Y:2024 | 07 | 2024 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,380 | $0 | n/a |
SJ0020 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,868 | $15,989 | n/a |
TR0058 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,832 | $216,216 | n/a |
TR0058 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,706 | $7,350 | n/a |
TR0058 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $727 | $2,781 | n/a |
TR0058 # 04 Y:2023 | 04 | 2023 | METER WASTE WATER | $408 | $1,511 | n/a |
MI0443 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO HEAT WATER | $4,071 | $12,390 | n/a |
MI0443 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,482 | $240 | n/a |
MI0443 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $1,287 | $501 | n/a |
MI0443 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,913 | $0 | n/a |
MI0443 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,162 | $54,938 | n/a |
MI0443 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,706 | $1,980 | n/a |
MI0443 # 04 Y:2024 | 04 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $7,616 | $18,760 | n/a |
MI0443 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,571 | $14,916 | n/a |
MS0428 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,631 | $131,059 | n/a |
MS0428 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $647 | $0 | n/a |
MS0428 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $788 | $1,677 | n/a |
MS0429 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,731 | $8,233 | n/a |
MS0429 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,847 | $35,728 | n/a |
MS0429 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,143 | $0 | n/a |