Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0552 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,000 | $12,000 | Not Implemented |
UD0552 # 03 Y:1998 | 03 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $18,478 | $1,800 | Not Implemented |
UD0552 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,681 | $7,118 | Not Implemented |
UD0552 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,972 | $0 | Not Implemented |
UD0552 # 06 Y:1998 | 06 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,132 | $600 | Implemented |
UD0552 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,486 | $2,000 | Implemented |
UD0551 # 01 Y:1998 | 01 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $42,000 | $2,400 | Not Implemented |
UD0551 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,897 | $10,073 | Implemented |
UD0551 # 03 Y:1998 | 03 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,400 | $7,000 | Not Implemented |
UD0551 # 04 Y:1998 | 04 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,083 | $225 | Implemented |
UD0550 # 01 Y:1998 | 01 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $135,950 | $139,962 | Not Implemented |
UD0550 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,061 | $1,031 | Implemented |
UD0550 # 03 Y:1998 | 03 | 1998 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $26,700 | $40,000 | Implemented |
UD0549 # 01 Y:1998 | 01 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $322,350 | $250,000 | Not Implemented |
UD0549 # 02 Y:1998 | 02 | 1998 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $12,682 | $0 | Implemented |
UD0549 # 03 Y:1998 | 03 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $3,343 | $1,000 | Not Implemented |
UD0549 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,070 | $3,903 | Not Implemented |
UD0549 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $736 | $0 | Implemented |
UD0549 # 06 Y:1998 | 06 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $624 | $500 | Implemented |
UD0549 # 07 Y:1998 | 07 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $204 | $250 | Not Implemented |
UD0548 # 02 Y:1998 | 02 | 1998 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $7,607 | $720 | Implemented |
UD0548 # 03 Y:1998 | 03 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,274 | $300 | Not Implemented |
UD0548 # 04 Y:1998 | 04 | 1998 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,375 | $1,120 | Implemented |
UD0548 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $2,000 | Not Implemented |
UD0548 # 01 Y:1998 | 01 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $2,243 | $0 | Implemented |