IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0326 # 08 Y:2022 08 2022 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $116,541 $552,315 Not Implemented
MZ0326 # 09 Y:2022 09 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,442 $18,650 Not Implemented
MZ0326 # 10 Y:2022 10 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $1,954 $1,170 Not Implemented
MZ0326 # 11 Y:2022 11 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $384,733 $2,868,753 Implemented
MZ0326 # 12 Y:2022 12 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,151 $600 Not Implemented
MU0007 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,417 $10,160 Implemented
MU0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,200 $7,825 Not Implemented
MU0007 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,914 $0 Implemented
MU0007 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,004 $0 Implemented
MU0007 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $612 $541 Not Implemented
MU0007 # 06 Y:2022 06 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12 $44 Implemented
LE0531 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $130,874 $22,000 Not Implemented
LE0531 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $84,178 $47,500 Not Implemented
LE0531 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330,596 $199,875 Not Implemented
LE0531 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49,409 $33,000 Not Implemented
LE0531 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,036 $10,414 Not Implemented
LE0531 # 06 Y:2022 06 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $88,444 $135,000 Not Implemented
KS2203 # 01 Y:2022 01 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $6,958 $5,101 Implemented
KS2203 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,131 $0 Implemented
KS2203 # 03 Y:2022 03 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,117 $60,601 Not Implemented
KS2203 # 04 Y:2022 04 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $98,216 $570,000 Implemented
KS2203 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,656 $5,480 Implemented
KS2203 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,676 $45 Implemented
KS2203 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,941 $13,595 Implemented
KS2203 # 08 Y:2022 08 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,802 $59,793 Not Implemented