Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0411 # 04 Y:2012 | 04 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $56,000 | $225,000 | Not Implemented |
UM0411 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $15,341 | $5,000 | Not Implemented |
UM0410 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $7,109 | $20,000 | Not Implemented |
UM0410 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,453 | $11,580 | Not Implemented |
UM0410 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,779 | $100 | Implemented |
UM0410 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,438 | $2,000 | Not Implemented |
UM0410 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $682 | $10 | Not Implemented |
UM0409 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,058 | $1,200 | Not Implemented |
UM0409 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,590 | $10,000 | Not Implemented |
UM0409 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,300 | $5,000 | Not Implemented |
UM0409 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $4,324 | $3,000 | Not Implemented |
UM0409 # 05 Y:2012 | 05 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,652 | $6,000 | Not Implemented |
UMS011 # 04 Y:2012 | 04 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $113,000 | $70,000 | Not Implemented |
UMS011 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $40,000 | $40,000 | Not Implemented |
UMS011 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $100,000 | $200,000 | Not Implemented |
UMS011 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $196,000 | $300,000 | Not Implemented |
UMS011 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $275,000 | $500,000 | Not Implemented |
UMS011 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,224,000 | $1,300,000 | Not Implemented |
UM0408 # 01 Y:2012 | 01 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $13,566 | $16,700 | Not Implemented |
UM0408 # 02 Y:2012 | 02 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,324 | $2,000 | Implemented |
UM0408 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,021 | $1,500 | Implemented |
UM0408 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,447 | $200 | Not Implemented |
UM0408 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $595 | $100 | Implemented |
UM0408 # 06 Y:2012 | 06 | 2012 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,364 | $0 | Implemented |
UM0408 # 07 Y:2012 | 07 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,129 | $1,000 | Implemented |