IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,550

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0101 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,600 $31,600 Not Implemented
AM0101 # 04 Y:1990 04 1990 REPAIR AND ELIMINATE STEAM LEAKS $7,200 $1,400 Implemented
AM0101 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $350 Implemented
AM0101 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $757 $0 Not Implemented
AM0101 # 07 Y:1990 07 1990 INSTALL SET-BACK TIMERS $718 $10,000 Implemented
TN0412 # 01 Y:1990 01 1990 USE MINIMUM STEAM OPERATING PRESSURE $46,500 $0 Implemented
TN0412 # 02 Y:1990 02 1990 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,598 $10,600 Not Implemented
TN0412 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,159 $0 Implemented
TN0412 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,317 $1,500 Implemented
TN0412 # 05 Y:1990 05 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,740 $2,460 Not Implemented
TN0412 # 06 Y:1990 06 1990 IMPROVE LUBRICATION PRACTICES $4,345 $0 Not Implemented
TN0413 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $17,798 $7,260 Implemented
TN0413 # 02 Y:1990 02 1990 KEEP LAMPS AND REFLECTORS CLEAN $5,149 $12,840 Implemented
TN0413 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $256 $300 Implemented
TN0413 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $563 Implemented
TN0413 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $230 $325 Implemented
UD0328 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $409 $1,000 Implemented
UD0328 # 02 Y:1990 02 1990 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,201 $3,000 Not Implemented
UD0328 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,019 $0 Implemented
UD0328 # 04 Y:1990 04 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,328 $400 Not Implemented
MA0188 # 01 Y:1990 01 1990 AIR CONDITION ONLY SPACE NECESSARY $7,209 $7,000 Not Implemented
MA0188 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,449 $1,600 Implemented
MA0188 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $6,213 $2,557 Implemented
MA0188 # 04 Y:1990 04 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,823 $185 Implemented
MA0188 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,378 $245 Implemented