IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163,425

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0367 # 06 Y:1989 06 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $590 $580 Not Implemented
GT0367 # 08 Y:1989 08 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $910 $0 Implemented
GT0367 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $165 $125 Implemented
GT0368 # 01 Y:1989 01 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,200 $45,000 Implemented
GT0368 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,370 $500 Implemented
GT0368 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,700 $10,000 Not Implemented
GT0368 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $630 $4,287 Not Implemented
GT0368 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,720 $0 Not Implemented
GT0368 # 06 Y:1989 06 1989 HEAT WATER WITH EXHAUST HEAT $50,190 $20,000 Implemented
TN0361 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $2,222 $548 Not Implemented
TN0361 # 07 Y:1989 07 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,339 $680 Implemented
TN0361 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,021 $0 Implemented
TN0361 # 09 Y:1989 09 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $188 $1,750 Not Implemented
TN0361 # 10 Y:1989 10 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,587 $780 Implemented
TN0361 # 11 Y:1989 11 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $82 $50 Implemented
TN0361 # 12 Y:1989 12 1989 INSULATE BARE EQUIPMENT $334 $247 Not Implemented
TN0361 # 13 Y:1989 13 1989 OPTIMIZE PLANT POWER FACTOR $37,840 $35,000 Implemented
TN0358 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $7,348 $1,020 Implemented
TN0358 # 02 Y:1989 02 1989 USE COMPRESSOR AIR FILTERS $5,608 $100 Implemented
TN0358 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,880 $1,000 Implemented
TN0358 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,687 $2,170 Not Implemented
TN0358 # 05 Y:1989 05 1989 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,001 $0 Implemented
TN0358 # 06 Y:1989 06 1989 INSTALL SET-BACK TIMERS $1,550 $0 Implemented
TN0358 # 07 Y:1989 07 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,240 $6,161 Not Implemented
TN0358 # 08 Y:1989 08 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $485 $120 Implemented