IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,198

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0226 # 11 Y:1987 11 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $422 $1,600 Not Implemented
KU0226 # 12 Y:1987 12 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $204 $0 Not Implemented
KU0226 # 13 Y:1987 13 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $170 $0 Not Implemented
KU0226 # 14 Y:1987 14 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $136 $0 Implemented
KU0223 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $8,607 $0 Not Implemented
KU0223 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,702 $1,847 Implemented
KU0223 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,201 $610 Implemented
KU0223 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,168 $0 Implemented
KU0223 # 05 Y:1987 05 1987 USE COMPRESSOR AIR FILTERS $884 $0 Implemented
KU0223 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $544 $102 Implemented
KU0223 # 07 Y:1987 07 1987 INSTALL AUTOMATIC STACK DAMPER $426 $800 Implemented
KU0223 # 08 Y:1987 08 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $380 $0 Implemented
KU0224 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,708 $10,000 Not Implemented
KU0224 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $62 $1,000 Implemented
MA0090 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,745 $901 Not Implemented
MA0090 # 02 Y:1987 02 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,660 $43 Not Implemented
MA0090 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $943 $0 Not Implemented
MA0090 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,216 $935 Not Implemented
MA0090 # 05 Y:1987 05 1987 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $14,656 $3,520 Not Implemented
MA0090 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $62 $200 Not Implemented
MA0091 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $712 $100 Not Implemented
MA0091 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $4,334 $1,215 Not Implemented
MA0091 # 03 Y:1987 03 1987 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,321 $3,062 Not Implemented
MA0091 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,619 $400 Implemented
MA0091 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,000 $3,400 Not Implemented