Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164,550
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0284 # 06 Y:1989 | 06 | 1989 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $618 | $0 | Implemented |
KU0284 # 07 Y:1989 | 07 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $931 | $1,018 | Implemented |
KU0284 # 08 Y:1989 | 08 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $169 | $0 | Implemented |
RU0059 # 01 Y:1989 | 01 | 1989 | REDESIGN PROCESS | $81,076 | $84,000 | Not Implemented |
RU0059 # 02 Y:1989 | 02 | 1989 | OPTIMIZE PLANT POWER FACTOR | $36,000 | $39,000 | Implemented |
RU0059 # 03 Y:1989 | 03 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,797 | $16,740 | Not Implemented |
RU0059 # 04 Y:1989 | 04 | 1989 | ISOLATE HOT OR COLD EQUIPMENT | $6,424 | $11,590 | Not Implemented |
RU0059 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,490 | $479 | Not Implemented |
RU0060 # 01 Y:1989 | 01 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $20,786 | $0 | Implemented |
RU0060 # 02 Y:1989 | 02 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $18,359 | $16,835 | Implemented |
RU0060 # 03 Y:1989 | 03 | 1989 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,856 | $6,900 | Not Implemented |
RU0060 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,256 | $0 | Implemented |
RU0060 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,180 | $102 | Implemented |
RU0060 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,072 | $1,500 | Implemented |
RU0061 # 01 Y:1989 | 01 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,588 | $2,880 | Implemented |
RU0061 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $785 | $203 | Not Implemented |
RU0061 # 03 Y:1989 | 03 | 1989 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,320 | $0 | Not Implemented |
GT0378 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $722 | Implemented |
GT0378 # 02 Y:1989 | 02 | 1989 | INSTALL SET-BACK TIMERS | $800 | $160 | Implemented |
GT0378 # 03 Y:1989 | 03 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,940 | $9,000 | Implemented |
GT0378 # 04 Y:1989 | 04 | 1989 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $65 | $40 | Implemented |
GT0378 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $250 | $300 | Implemented |
GT0378 # 06 Y:1989 | 06 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,183 | $1,725 | Implemented |
GT0379 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,310 | $13,690 | Not Implemented |
GT0379 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $905 | $403 | Not Implemented |