IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,774

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0247 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $447 Implemented
OK0240 # 01 Y:1987 01 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,147 $5,000 Implemented
OK0240 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $0 Implemented
MA0112 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $14,021 $8,866 Not Implemented
MA0112 # 02 Y:1988 02 1988 INSTALL SET-BACK TIMERS $534 $0 Implemented
MA0112 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $243 Not Implemented
MA0112 # 04 Y:1988 04 1988 REDESIGN PROCESS $5,082 $0 Not Implemented
MA0113 # 01 Y:1988 01 1988 REDUCE VENTILATION AIR $1,763 $8 Implemented
MA0113 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $474 $0 Implemented
MA0113 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,486 $1,102 Not Implemented
MA0113 # 04 Y:1988 04 1988 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,344 $8,408 Not Implemented
MA0113 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $90 $75 Not Implemented
MA0113 # 06 Y:1988 06 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,075 $2,000 Not Implemented
GT0336 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,025 $19,500 Implemented
GT0336 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $228 Not Implemented
GT0336 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,130 $0 Implemented
GT0336 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,790 $1,600 Not Implemented
GT0336 # 05 Y:1988 05 1988 REDESIGN PROCESS $2,610 $2,100 Implemented
UD0249 # 01 Y:1988 01 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $1,200 Implemented
UD0249 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,052 $2,200 Implemented
UD0249 # 03 Y:1988 03 1988 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $712 $550 Implemented
UD0249 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $534 $3,054 Implemented
UD0250 # 01 Y:1988 01 1988 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $22,500 $50,000 Not Implemented
UD0250 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,618 $7,000 Not Implemented
UD0250 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $1,780 $840 Not Implemented