Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,084
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0342 # 07 Y:1988 | 07 | 1988 | INSTALL SET-BACK TIMERS | $2,096 | $0 | Implemented |
TN0342 # 08 Y:1988 | 08 | 1988 | IMPROVE LUBRICATION PRACTICES | $1,084 | $450 | Implemented |
TN0342 # 09 Y:1988 | 09 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $938 | $540 | Implemented |
TN0343 # 01 Y:1988 | 01 | 1988 | KEEP LAMPS AND REFLECTORS CLEAN | $42,911 | $23,701 | Implemented |
TN0343 # 02 Y:1988 | 02 | 1988 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $14,762 | $35,660 | Not Implemented |
TN0343 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,447 | $4,500 | Implemented |
TN0343 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,721 | $0 | Not Implemented |
TN0343 # 05 Y:1988 | 05 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,610 | $2,000 | Implemented |
TN0343 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,647 | $780 | Implemented |
TN0343 # 07 Y:1988 | 07 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,034 | $1,300 | Implemented |
TN0344 # 01 Y:1988 | 01 | 1988 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $36,635 | $0 | Not Implemented |
TN0344 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,098 | $1,850 | Implemented |
TN0344 # 03 Y:1988 | 03 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,913 | $5,000 | Not Implemented |
TN0344 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,521 | $1,313 | Implemented |
TN0344 # 05 Y:1988 | 05 | 1988 | IMPROVE LUBRICATION PRACTICES | $982 | $0 | Not Implemented |
TN0344 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $840 | $1,200 | Implemented |
TN0344 # 07 Y:1988 | 07 | 1988 | OPTIMIZE PLANT POWER FACTOR | $6,206 | $6,400 | Not Implemented |
UD0260 # 01 Y:1988 | 01 | 1988 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,647 | $500 | Implemented |
UD0260 # 02 Y:1988 | 02 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,125 | $0 | Not Implemented |
UD0260 # 03 Y:1988 | 03 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,025 | $2,000 | Implemented |
UD0260 # 04 Y:1988 | 04 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,447 | $0 | Implemented |
UD0260 # 05 Y:1988 | 05 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,399 | $180 | Implemented |
UD0260 # 06 Y:1988 | 06 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,469 | $200 | Not Implemented |
UD0261 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,051 | $0 | Not Implemented |
UD0261 # 02 Y:1988 | 02 | 1988 | RECOVER AND REUSE COOLING WATER | $3,120 | $6,000 | Implemented |