IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,387

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0050 # 02 Y:1986 02 1986 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $6,892 $1,700 Not Implemented
AT0050 # 03 Y:1986 03 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,822 $20,000 Not Implemented
AT0050 # 04 Y:1986 04 1986 RECOVER WASTE HEAT FROM EQUIPMENT $361 $300 Not Implemented
AT0050 # 05 Y:1986 05 1986 REDUCE VENTILATION AIR $8,542 $203 Not Implemented
UD0213 # 01 Y:1987 01 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,229 $20,000 Implemented
UD0213 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,000 $10,000 Implemented
UD0213 # 03 Y:1987 03 1987 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $45,881 $100,000 Not Implemented
UD0213 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,036 $2,000 Implemented
UD0213 # 05 Y:1987 05 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,181 $15,000 Implemented
UD0214 # 01 Y:1987 01 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,963 $3,000 Not Implemented
UD0214 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,230 $800 Implemented
UD0214 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $910 Implemented
UD0214 # 04 Y:1987 04 1987 COVER OPEN TANKS $1,924 $400 Not Implemented
UD0215 # 01 Y:1987 01 1987 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,028 $0 Implemented
UD0215 # 02 Y:1987 02 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $662 $140 Implemented
UD0215 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,008 $6,500 Not Implemented
UD0215 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $265 $300 Implemented
LT0066 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $602 $210 Not Implemented
LT0066 # 02 Y:1986 02 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,230 $12,000 Implemented
LT0066 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $334 Not Implemented
LT0066 # 04 Y:1986 04 1986 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $84 $8 Not Implemented
LT0073 # 01 Y:1986 01 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,670 $250 Not Implemented
LT0073 # 02 Y:1986 02 1986 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,620 $0 Not Implemented
LT0073 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $760 $0 Implemented
LT0073 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $605 $3,500 Not Implemented