IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,320

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0016 # 06 Y:1981 06 1981 INSULATE BARE EQUIPMENT $792 $700 Not Implemented
KU0017 # 01 Y:1981 01 1981 RECOVER WASTE HEAT FROM EQUIPMENT $2,038 $4,000 Implemented
KU0017 # 02 Y:1981 02 1981 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,749 $0 Implemented
KU0017 # 03 Y:1981 03 1981 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,230 $2,000 Implemented
KU0017 # 04 Y:1981 04 1981 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,272 $1,000 Implemented
KU0017 # 05 Y:1981 05 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,396 $19,385 Not Implemented
KU0017 # 06 Y:1981 06 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,358 $746 Implemented
KU0017 # 07 Y:1981 07 1981 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,477 $0 Implemented
KU0018 # 01 Y:1981 01 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,659 $0 Implemented
KU0018 # 02 Y:1981 02 1981 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,039 $1,600 Implemented
KU0018 # 03 Y:1981 03 1981 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $495 $0 Not Implemented
KU0018 # 04 Y:1981 04 1981 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $518 $1,020 Implemented
KU0020 # 01 Y:1981 01 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $638 Not Implemented
KU0020 # 02 Y:1981 02 1981 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,161 $260 Not Implemented
KU0020 # 03 Y:1981 03 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $34 $132 Not Implemented
KU0021 # 01 Y:1981 01 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $4,149 Implemented
KU0021 # 02 Y:1981 02 1981 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,510 $2,000 Not Implemented
KU0021 # 03 Y:1981 03 1981 INSTALL TIMERS AND/OR THERMOSTATS $3,640 $5,000 Implemented
KU0021 # 04 Y:1981 04 1981 TURN OFF STEAM TRACING DURING MILD WEATHER $430 $0 Implemented
KU0021 # 05 Y:1981 05 1981 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $520 $0 Implemented