Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164,670
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0592 # 09 Y:2025 | 09 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $513 | $2,500 | n/a |
KS2437 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,199 | $5,960 | n/a |
KS2437 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,218 | $60 | n/a |
KS2437 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $771 | $2,184 | n/a |
KS2437 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,668 | $1,600 | n/a |
KS2437 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,870 | $69,278 | n/a |
KS2437 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,984 | $340,586 | n/a |
KS2437 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,975 | $88,610 | n/a |
KS2437 # 08 Y:2024 | 08 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,546 | $4,072 | n/a |
KS2437 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $65,208 | $627,000 | n/a |
LS2506 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $135 | n/a |
LS2506 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $4,511 | $500 | n/a |
LS2506 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $50 | n/a |
LS2506 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $24,849 | $20,250 | n/a |
LS2506 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $9,990 | n/a |
LS2506 # 06 Y:2025 | 06 | 2025 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $3,451 | $15,964 | n/a |
LS2506 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,703 | $514,800 | n/a |
LS2506 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,930 | $80,003 | n/a |
CI0042 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,111 | $675,274 | n/a |
CI0042 # 02 Y:2024 | 02 | 2024 | REPLACE BOILER | $66,255 | $50,000 | n/a |
CI0042 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $44,001 | $25,000 | n/a |
CI0042 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,610 | $14,000 | n/a |
CI0042 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,797 | $90,000 | n/a |
CI0042 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,424 | $4,950 | n/a |
CI0042 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $8,210 | $2,325 | n/a |