IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 18 Y:2024 18 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $10,000 n/a
OK1103 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,866 $18,693 n/a
OK1103 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,305 $190,944 n/a
OK1103 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,355 $1,490 n/a
OK1103 # 04 Y:2024 04 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,069 $8,525 n/a
DL0231 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172,461 $34,600 n/a
DL0231 # 02 Y:2024 02 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $229,694 $2,880,000 n/a
DL0231 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $149,450 $333,800 n/a
DL0231 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $25,112 $9,768 n/a
DL0231 # 05 Y:2024 05 2024 MAINTAIN MACHINES TO REDUCE LEAKS $132,876 $34,600 n/a
DL0231 # 06 Y:2024 06 2024 MAINTAIN MACHINES TO REDUCE LEAKS $441,845 $39,600 n/a
DL0231 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $211,766 $21,800 n/a
DL0231 # 08 Y:2024 08 2024 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $266,000 $385,800 n/a
MI0430 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,630 $580 Implemented
MI0430 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,475 $1,920 Not Implemented
MI0430 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,086 $3,360 Not Implemented
MI0430 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $3,751 Not Implemented
MI0430 # 05 Y:2023 05 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,834 $7,288 Implemented
MI0430 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,813 $470 Implemented
MI0430 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,292 $1,980 Implemented
SJ0009 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $67,746 $441,525 n/a
SJ0009 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,869 $18,228 n/a
SJ0009 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,699 $844 n/a
SJ0009 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $764 $32 n/a
SJ0009 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,705 $0 n/a