IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0326 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,520 $83,400 Not Implemented
OR0326 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $6,000 $0 Not Implemented
OR0326 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,653 $1,000 Implemented
OR0326 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,856 $1,210 Implemented
OR0326 # 05 Y:1998 05 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $1,680 $405 Not Implemented
OR0326 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $1,559 $10,400 Not Implemented
OR0326 # 07 Y:1998 07 1998 USE OTHER WASTE CONCENTRATION METHODS $20,930 $13,295 Implemented
OR0326 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,920 $3,680 Not Implemented
OR0325 # 01 Y:1998 01 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $5,486 $500 Not Implemented
OR0325 # 02 Y:1998 02 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,215 $6,816 Not Implemented
OR0325 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $4,674 $0 Implemented
OR0325 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,213 $1,000 Not Implemented
OR0325 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $970 $0 Not Implemented
OR0324 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,000 $178,750 Not Implemented
OR0324 # 02 Y:1998 02 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $88,020 $60,000 Not Implemented
OR0324 # 03 Y:1998 03 1998 REDUCE SCRAP PRODUCTION $34,430 $11,000 Not Implemented
OR0324 # 04 Y:1998 04 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $11,110 $42,200 Not Implemented
OR0324 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,950 $800 Not Implemented
OR0324 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,935 $2,000 Implemented
OR0324 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,860 $3,700 Implemented
OR0324 # 08 Y:1998 08 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $2,460 $1,060 Implemented
OR0323 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,329 $15,000 Implemented
OR0323 # 02 Y:1998 02 1998 UPGRADE CONTROLS ON COMPRESSORS $33,509 $5,600 Implemented
OR0323 # 03 Y:1998 03 1998 RECOVER AND REUSE WASTE MATERIAL $16,330 $15,000 Implemented
OR0323 # 04 Y:1998 04 1998 ADD AREA LIGHTING SWITCHES $3,712 $2,800 Not Implemented