Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0326 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,520 | $83,400 | Not Implemented |
OR0326 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,000 | $0 | Not Implemented |
OR0326 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,653 | $1,000 | Implemented |
OR0326 # 04 Y:1998 | 04 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,856 | $1,210 | Implemented |
OR0326 # 05 Y:1998 | 05 | 1998 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,680 | $405 | Not Implemented |
OR0326 # 06 Y:1998 | 06 | 1998 | OPTIMIZE PLANT POWER FACTOR | $1,559 | $10,400 | Not Implemented |
OR0326 # 07 Y:1998 | 07 | 1998 | USE OTHER WASTE CONCENTRATION METHODS | $20,930 | $13,295 | Implemented |
OR0326 # 08 Y:1998 | 08 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,920 | $3,680 | Not Implemented |
OR0325 # 01 Y:1998 | 01 | 1998 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,486 | $500 | Not Implemented |
OR0325 # 02 Y:1998 | 02 | 1998 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $16,215 | $6,816 | Not Implemented |
OR0325 # 03 Y:1998 | 03 | 1998 | ADJUST BURNERS FOR EFFICIENT OPERATION | $4,674 | $0 | Implemented |
OR0325 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,213 | $1,000 | Not Implemented |
OR0325 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $970 | $0 | Not Implemented |
OR0324 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $300,000 | $178,750 | Not Implemented |
OR0324 # 02 Y:1998 | 02 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $88,020 | $60,000 | Not Implemented |
OR0324 # 03 Y:1998 | 03 | 1998 | REDUCE SCRAP PRODUCTION | $34,430 | $11,000 | Not Implemented |
OR0324 # 04 Y:1998 | 04 | 1998 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $11,110 | $42,200 | Not Implemented |
OR0324 # 05 Y:1998 | 05 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,950 | $800 | Not Implemented |
OR0324 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,935 | $2,000 | Implemented |
OR0324 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,860 | $3,700 | Implemented |
OR0324 # 08 Y:1998 | 08 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,460 | $1,060 | Implemented |
OR0323 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,329 | $15,000 | Implemented |
OR0323 # 02 Y:1998 | 02 | 1998 | UPGRADE CONTROLS ON COMPRESSORS | $33,509 | $5,600 | Implemented |
OR0323 # 03 Y:1998 | 03 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $16,330 | $15,000 | Implemented |
OR0323 # 04 Y:1998 | 04 | 1998 | ADD AREA LIGHTING SWITCHES | $3,712 | $2,800 | Not Implemented |