IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
NAICS 327212 Other Pressed and Blown Glass and Glassware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0612 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,008 $8,132 Implemented
WV0612 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,641 $4,320 Implemented
WV0612 # 11 Y:2021 11 2021 INSTALL SET-BACK TIMERS $611 $1,110 Implemented
WV0612 # 10 Y:2021 10 2021 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $701 $397 Implemented
WV0612 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,446 $16,700 Implemented
MZ0250 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,697 $0 Implemented
MZ0250 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,786 $280 Implemented
MZ0250 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,351 $5,600 Implemented
WV0547 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,491 $9,434 Implemented
WV0547 # 09 Y:2017 09 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $243 $1,000 Implemented
WV0547 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $412 $2,050 Implemented
WV0547 # 06 Y:2017 06 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $970 $4,600 Implemented
WV0547 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $175 $850 Implemented
WV0547 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $15,992 $5,658 Implemented
NC0556 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $59,808 $90,000 Implemented
NC0556 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $578 $868 Implemented
NC0556 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,584 $8,350 Implemented
NC0556 # 05 Y:2015 05 2015 DEVELOP A REPAIR/REPLACE POLICY $1,836 $4,256 Implemented
NC0556 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,438 $12,000 Implemented
LE0396 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $1,000 Implemented
LE0396 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,534 $1,644 Implemented
LE0396 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $214 $105 Implemented
LE0396 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,080 $2,845 Implemented
LE0396 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $35 Implemented
UD0923 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $5,978 $19,581 Implemented