IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0052 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,444 $3,000 Implemented
WV0419 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,262 $161,162 Implemented
WV0419 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $528 Implemented
IA0458 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,769 $2,181 Implemented
IA0458 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,473 $1,020 Implemented
IA0458 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $48,853 $11,000 Implemented
IA0458 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,683 $2,050 Implemented
IA0458 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $816 $500 Implemented
IA0458 # 08 Y:2010 08 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $26,636 $22,000 Implemented
TT0050 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,479 $4,300 Implemented
TT0050 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $0 Implemented
TT0050 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,900 $500 Implemented
OK0788 # 04 Y:2010 04 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,625 $1,176 Implemented
OK0788 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $285 $451 Implemented
OK0788 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,350 $8,818 Implemented
OK0788 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,265 $98,109 Implemented
OK0788 # 10 Y:2010 10 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,837 $12,000 Implemented
NC0400 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $75 $200 Implemented
NC0400 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $1,761 $4,346 Implemented
NC0400 # 02 Y:2010 02 2010 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $9,007 $37,000 Implemented
AM0571 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $1,500 Implemented
AM0571 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,605 $0 Implemented
AM0571 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $1,900 Implemented
AM0571 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $1,500 Implemented
AM0571 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,010 $31,300 Implemented