IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0273 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $3,232 $17,400 Implemented
SF0273 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,355 $84,428 Implemented
SF0273 # 10 Y:2003 10 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,103 $13,336 Implemented
SF0273 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $728 $728 Implemented
SF0273 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,656 $480 Implemented
SF0273 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,765 $300 Implemented
SF0269 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,653 $0 Implemented
SF0269 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $635 $0 Implemented
SD0328 # 01 Y:2003 01 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $269,910 $1,371,000 Implemented
SD0328 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,323 $0 Implemented
SF0265 # 02 Y:2003 02 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,384 $1,271 Implemented
SF0265 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $1,420 $2,280 Implemented
SF0265 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $503 $824 Implemented
SF0265 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,600 $0 Implemented
SF0262 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,464 $5,555 Implemented
SF0262 # 05 Y:2003 05 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,013 $2,748 Implemented
SF0262 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $2,530 $3,638 Implemented
SD0316 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,922 $0 Implemented
SD0316 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $300 Implemented
LM0050 # 10 Y:2003 10 2003 $5,943 $1,000 Implemented
LM0050 # 09 Y:2003 09 2003 $19,825 $6,026 Implemented
LM0050 # 07 Y:2003 07 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,896 $2,669 Implemented
LM0050 # 06 Y:2003 06 2003 KEEP BOILER TUBES CLEAN $552 $1,000 Implemented
LM0050 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,993 $350 Implemented