Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0458 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,339 | $0 | Implemented |
SF0458 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,582 | $522 | Implemented |
SF0458 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $459 | $1,384 | Implemented |
SF0458 # 08 Y:2014 | 08 | 2014 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,900 | $0 | Implemented |
SF0449 # 01 Y:2014 | 01 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $660 | $280 | Implemented |
SF0449 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,630 | $27,842 | Implemented |
SD0485 # 04 Y:2014 | 04 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,807 | $28,125 | Implemented |
SD0485 # 03 Y:2014 | 03 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $25,053 | $91,900 | Implemented |
SD0485 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,720 | $5,000 | Implemented |
SD0485 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,114 | $1,000 | Implemented |
SD0485 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $1,975 | $5,550 | Implemented |
SD0485 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,832 | $4,400 | Implemented |
SD0468 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,073 | $700 | Implemented |
SD0468 # 03 Y:2013 | 03 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,278 | $1,600 | Implemented |
SD0468 # 02 Y:2013 | 02 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $7,607 | $1,050 | Implemented |
SD0468 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,265 | $23,840 | Implemented |
SF0430 # 02 Y:2013 | 02 | 2013 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,697 | $768 | Implemented |
SF0430 # 03 Y:2013 | 03 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,822 | $885 | Implemented |
SF0430 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,421 | $0 | Implemented |
SF0430 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,465 | $16,491 | Implemented |
SD0463 # 04 Y:2013 | 04 | 2013 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,768 | $2,210 | Implemented |
SD0460 # 10 Y:2013 | 10 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $731 | $2,500 | Implemented |
SD0460 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,570 | $200 | Implemented |
SD0460 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,515 | $3,212 | Implemented |
SD0460 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,875 | $900 | Implemented |